Home Home
 
 
 
Home > Portfolio > Concretec Project
Client: Concretos Técnicos de México
Year: 2004
Name of the Project:
Order Scheduling System
Development type: Web
Technologies:
Windows 2000 Server, Asp 3.0, Visual Basic 6.0
Architecture: DNA
Duration: 1 year 5 months
   

It is an order scheduling logistics system for the concrete industry that controls the scheduling of the delivery units, thus allowing it to reduce delivery times and increase the productivity of the units in the transport of concrete. The dates and loads of the mixer trucks and bombs are initially captured in the system. The system then automatically assigns specific units, plants and load times for each order according to predefined criteria. All the scheduling is graphically displayed on a dashboard where orders can be edited, moved or reassigned.

 
 Back